Log/Rock Grapple

Short Description:

Hydraulic timber and stone grabs for excavators are auxiliary attachments used to extract and transport wood, stones, and similar materials in construction, civil engineering, and other fields. Installed on the excavator arm and powered by the hydraulic system, they feature a pair of movable jaws that can open and close, securely gripping the desired objects.

1. **Timber Handling:** Hydraulic timber grabs are employed for gripping wood logs, tree trunks, and wooden piles, commonly used in forestry, timber processing, and construction projects.

2. **Stone Transport:** Stone grabs are used to grasp and transport stones, rocks, bricks, etc., proving valuable in construction, roadworks, and mining operations.

3. **Clearing Work:** These gripping tools can also be utilized for cleaning tasks, such as removing debris from building ruins or construction sites.


Product Detail

Specification

Warranty

Maintenance

Product Tags

Applications

Wood (steel) Grabbe apply06
Wood (steel) Grabbe apply05
Wood (steel) Grabbe apply04
Wood (steel) Grabbe apply03
Wood (steel) Grabbe apply02
Wood (steel) Grabbe apply01

Our product is suitable for excavators of various brands and we have established long-term and stable partnerships with some well-known brands.

cor2

Product Parameters

Double cylinder wood (steel) grabber

Model

Unit

JXZM04

JXZM06

JXZN08

JXZM10

Weight

kg

390

740

1380

1700

Opening Size

mm

1400

1800

2300

2500

Working Pressure

Kg/cm²

120-160

150-170

160-180

160-180

Setting Pressure

Kg/cm²

180

190

200

210

Working Flow

lpm

50-100

90-110

100-140

130-170

Suitable Excavator

t

7-11

12-16

17-23

24-30

Single cylinder wood (steel) grabber

Mechanical wood (steel) grabber

Holding wood (steel) grabber

Model

Unit

Z04D

Z06D

Z02J

Z04H

Weight

kg

342

829

135

368

Opening Size

mm

1362

1850

880

1502

Working Pressure

Kg/cm²

110-140

150-170

100-110

110-140

Setting Pressure

Kg/cm²

170

190

130

170

Working Flow

lpm

30-55

90-110

20-40

30-55

Suitable Excavator

t

7-11

12-16

1.7-3.0

7-11

Product advantages

**Advantages:**

1. **Enhanced Efficiency:** Using hydraulic timber and stone grabs increases efficiency in handling and clearing, reducing labor costs and time.

2. **Precise Operation:** The hydraulic system enables precise operation, allowing accurate control over gripping force and object positioning.

3. **Adaptability to Various Materials:** These tools are versatile, adaptable to different types of materials, ranging from wood to stones, enhancing operational flexibility.

4. **Reduced Personnel Risk:** Utilizing hydraulic grabbing tools decreases direct contact between personnel and heavy objects, thereby improving job safety.

5. **Cost Savings:** By boosting work efficiency and cutting labor expenses, hydraulic grabbing tools contribute to overall project cost reduction.

In conclusion, hydraulic timber and stone grabs for excavators serve as versatile auxiliary attachments for gripping, transporting, and clearing wood, stones, and other objects. They elevate work efficiency while minimizing associated risks.

About Juxiang


  • Previous:
  • Next:

  • Excavator use Juxiang S600 Sheet Pile Vibro Hammer

    Accessoryname Warrantyperiod Warranty Range
    Motor 12 months It is free to replace the cracked shell and broken output shaft within 12 months. If the oil leakage occurs for more than 3 months, it is not covered by the claim. You must purchase the oil seal by yourself.
    Eccentricironassembly 12 months The rolling element and the track stuck and corroded are not covered by the claim because the lubricating oil is not filled according to the specified time, the oil seal replacement time is exceeded, and the regular maintenance is poor.
    ShellAssembly 12 months Damages caused by non-compliance with operating practices,and breaks caused by reinforce without the consent of our company,are not within the scope of claims.If Steel plate cracks within 12 months,the company will change the breaking parts;If Weld bead cracks,please weld by yourself.If you are not capable to weld,the company could weld for free,but no other expenses.
    Bearing 12 months The damage caused by poor regular maintenance, wrong operation, failure to add or replace gear oil as required or is not within the scope of claim.
    CylinderAssembly 12 months If the cylinder casing cracks or the cylinder rod breaks, a new component will be provided at no cost. However, oil leakage within 3 months is not covered by claims, and you need to buy the replacement oil seal yourself.
    Solenoid Valve/throttle /check valve /flood valve 12 months Damages caused by the coil short-circuit due to external impact and incorrect positive/negative connections are not covered by the claim.
    Wiring harness 12 months The short circuit caused by external force extrusion, tearing, burning and wrong wire connection is not within the scope of claim settlement.
    Pipeline 6 months Damage caused by improper maintenance, external force collision, and excessive adjustment of the relief valve is not within the scope of claims.
    Bolts, foot switches, handles, connecting rods, fixed teeth, movable teeth and pin shafts are not guaranteed; The damage of parts caused by failure to use the company’s pipeline or failure to comply with the pipeline requirements provided by the company is not within the scope of claim settlement.

    1. When installing a pile driver onto an excavator, make sure the excavator’s hydraulic oil and filters are replaced after the installation and testing. This ensures the hydraulic system and parts of the pile driver work smoothly. Any impurities can damage the hydraulic system, causing issues and reducing the machine’s lifespan. **Note:** Pile drivers demand high standards from the excavator’s hydraulic system. Check and repair thoroughly before installation.

    2. New pile drivers need a break-in period. For the first week of use, change the gear oil after half a day to a day’s work, then every 3 days. That’s three gear oil changes within a week. After this, do regular maintenance based on working hours. Change the gear oil every 200 working hours (but no more than 500 hours). This frequency can be adjusted depending on how much you work. Also, clean the magnet each time you change the oil. **Note:** Don’t go longer than 6 months between maintenance.

    3. The magnet inside mainly filters. During pile driving, friction creates iron particles. The magnet keeps the oil clean by attracting these particles, reducing wear. Cleaning the magnet is important, about every 100 working hours, adjusting as needed based on how much you work.

    4. Before starting each day, warm up the machine for 10-15 minutes. When the machine has been idle, oil settles at the bottom. Starting it means the upper parts lack lubrication initially. After about 30 seconds, the oil pump circulates oil to where it’s needed. This reduces wear on parts like pistons, rods, and shafts. While warming up, check screws and bolts, or grease parts for lubrication.

    5. When driving piles, use less force initially. More resistance means more patience. Gradually drive the pile in. If the first level of vibration works, there’s no need to rush with the second level. Understand, while it might be quicker, more vibration increases wear. Whether using the first or second level, if pile progress is slow, pull the pile out 1 to 2 meters. With the pile driver and excavator’s power, this helps the pile go deeper.

    6. After driving the pile, wait 5 seconds before releasing the grip. This reduces wear on the clamp and other parts. When releasing the pedal after driving the pile, due to inertia, all parts are tight. This reduces wear. The best time to release the grip is when the pile driver stops vibrating.

    7. The rotating motor is for installing and removing piles. Don’t use it to correct pile positions caused by resistance or twisting. The combined effect of resistance and the pile driver’s vibration is too much for the motor, leading to damage over time.

    8. Reversing the motor during over-rotation stresses it, causing damage. Leave 1 to 2 seconds between reversing the motor to avoid straining it and its parts, extending their life.

    9. While working, watch for any issues, like unusual shaking of oil pipes, high temperatures, or odd sounds. If you notice something, stop immediately to check. Small things can prevent big problems.

    10. Ignoring small issues leads to big ones. Understanding and caring for equipment not only reduces damage but also costs and delays.

  • Other Level Vibro Hammer

    Other Attachments