Screening Bucket

Short Description:

A screening bucket is a specialized attachment for excavators or loaders used primarily to separate and sift materials of varying sizes such as soil, sand, gravel, construction debris, and more.


Product Detail

Specification

Warranty

Maintenance

Product Tags

Screening Bucket _detail2
Screening Bucket _detail3
Screening Bucket _detail1

Product advantages

Model

Unit

JX02SF

JX04SF

JX06SF

JX08SF

JX10SF

Suits Excavator

Ton

2~4

6~10

12~17

18~23

25~36

Screen Diameter

mm

610

810

1000

1350

1500

Rotating Speed

R/min

60

65

65

65

65

Working Pressure

Bar

150

220

230

250

250

Oil Flow

L/min

30

60

80

110

110

Weight

Kg

175

630

1020

1920

2430

Applications

1. Material Screening: A screening bucket is employed to segregate materials of different sizes, filtering out larger particles for more appropriate subsequent handling or utilization
2. Resource Recovery: In construction waste management, for instance, a screening bucket can aid in the separation and recovery of reusable materials like bricks and concrete fragments.
3. Soil Treatment: In horticulture, agriculture, and related fields, screening buckets can be used to sift soil, removing impurities and enhancing soil quality.
4. Construction Sites: At construction sites, a screening bucket can be used to prepare foundational materials, such as appropriately sized sand and gravel for concrete preparation.

Design advantage

Screening Bucket _design3
Screening Bucket _design2
Screening Bucket _design1

1. Efficient Screening: Screening buckets efficiently segregate materials of varying sizes, boosting operational efficiency.
2. Cost Savings: Utilizing a screening bucket at the source minimizes the costs and efforts associated with subsequent material processing.
3. Versatility: Screening buckets are applicable across various materials and scenarios, displaying strong adaptability.
4. Precision Selection: The design of a screening bucket allows for precise selection as required, catering to specific needs.
5. Environmental Friendliness: By segregating materials at the source, screening buckets contribute to waste reduction, aiding environmental efforts.
In summary, a screening bucket serves pivotal roles in multiple domains, and its efficient sorting capability coupled with diverse advantages make it a potent tool for engineering and resource handling.

product display

Applications

Our product is suitable for excavators of various brands and we have established long-term and stable partnerships with some well-known brands.

cor2

About Juxiang


  • Previous:
  • Next:

  • Excavator use Juxiang S600 Sheet Pile Vibro Hammer

    Accessoryname Warrantyperiod Warranty Range
    Motor 12 months It is free to replace the cracked shell and broken output shaft within 12 months. If the oil leakage occurs for more than 3 months, it is not covered by the claim. You must purchase the oil seal by yourself.
    Eccentricironassembly 12 months The rolling element and the track stuck and corroded are not covered by the claim because the lubricating oil is not filled according to the specified time, the oil seal replacement time is exceeded, and the regular maintenance is poor.
    ShellAssembly 12 months Damages caused by non-compliance with operating practices,and breaks caused by reinforce without the consent of our company,are not within the scope of claims.If Steel plate cracks within 12 months,the company will change the breaking parts;If Weld bead cracks,please weld by yourself.If you are not capable to weld,the company could weld for free,but no other expenses.
    Bearing 12 months The damage caused by poor regular maintenance, wrong operation, failure to add or replace gear oil as required or is not within the scope of claim.
    CylinderAssembly 12 months If the cylinder barrel is cracked or the cylinder rod is broken, the new component will be replaced free of charge. The oil leakage occurring within 3 months is not within the scope of claims, and the oil seal must be purchased by yourself.
    Solenoid Valve/throttle /check valve /flood valve 12 months The coil short-circuited due to external impact and the incorrect positive and negative connection is not in the scope of claim.
    Wiring harness 12 months The short circuit caused by external force extrusion, tearing, burning and wrong wire connection is not within the scope of claim settlement.
    Pipeline 6 months Damage caused by improper maintenance, external force collision, and excessive adjustment of the relief valve is not within the scope of claims.
    Bolts, foot switches, handles, connecting rods, fixed teeth, movable teeth and pin shafts are not guaranteed; The damage of parts caused by failure to use the company’s pipeline or failure to comply with the pipeline requirements provided by the company is not within the scope of claim settlement.

    1. When installing a pile driver onto an excavator, make sure the excavator’s hydraulic oil and filters are replaced after the installation and testing. This ensures the hydraulic system and parts of the pile driver work smoothly. Any impurities can damage the hydraulic system, causing issues and reducing the machine’s lifespan. **Note:** Pile drivers demand high standards from the excavator’s hydraulic system. Check and repair thoroughly before installation.

    2. New pile drivers need a break-in period. For the first week of use, change the gear oil after half a day to a day’s work, then every 3 days. That’s three gear oil changes within a week. After this, do regular maintenance based on working hours. Change the gear oil every 200 working hours (but no more than 500 hours). This frequency can be adjusted depending on how much you work. Also, clean the magnet each time you change the oil. **Note:** Don’t go longer than 6 months between maintenance.

    3. The magnet inside mainly filters. During pile driving, friction creates iron particles. The magnet keeps the oil clean by attracting these particles, reducing wear. Cleaning the magnet is important, about every 100 working hours, adjusting as needed based on how much you work.

    4. Before starting each day, warm up the machine for 10-15 minutes. When the machine has been idle, oil settles at the bottom. Starting it means the upper parts lack lubrication initially. After about 30 seconds, the oil pump circulates oil to where it’s needed. This reduces wear on parts like pistons, rods, and shafts. While warming up, check screws and bolts, or grease parts for lubrication.

    5. When driving piles, use less force initially. More resistance means more patience. Gradually drive the pile in. If the first level of vibration works, there’s no need to rush with the second level. Understand, while it might be quicker, more vibration increases wear. Whether using the first or second level, if pile progress is slow, pull the pile out 1 to 2 meters. With the pile driver and excavator’s power, this helps the pile go deeper.

    6. After driving the pile, wait 5 seconds before releasing the grip. This reduces wear on the clamp and other parts. When releasing the pedal after driving the pile, due to inertia, all parts are tight. This reduces wear. The best time to release the grip is when the pile driver stops vibrating.

    7. The rotating motor is for installing and removing piles. Don’t use it to correct pile positions caused by resistance or twisting. The combined effect of resistance and the pile driver’s vibration is too much for the motor, leading to damage over time.

    8. Reversing the motor during over-rotation stresses it, causing damage. Leave 1 to 2 seconds between reversing the motor to avoid straining it and its parts, extending their life.

    9. While working, watch for any issues, like unusual shaking of oil pipes, high temperatures, or odd sounds. If you notice something, stop immediately to check. Small things can prevent big problems.

    10. Ignoring small issues leads to big ones. Understanding and caring for equipment not only reduces damage but also costs and delays.

  • Other Level Vibro Hammer

    Other Attachments