The best guide to modifying the excavator piling arm

Nowadays, building construction projects are everywhere, and construction machinery can be seen everywhere, especially pile drivers. Piling machines are the main machinery for building foundations, and modifying excavator pile-driving arms is a common engineering machinery modification project. It can improve the versatility and adaptability of the excavator, allowing it to play a greater role in different engineering projects. effect.640 (2)

The following aspects should be considered when modifying the excavator piling arm:
1
A comprehensive inspection and evaluation of the excavator is required before modification. This includes checking the working status of the excavator’s mechanical structure, hydraulic system and electrical system to ensure that the excavator can adapt to the needs of the piling arm modification. At the same time, the load-bearing capacity and stability of the excavator also need to be evaluated to determine whether the modified piling arm can withstand the corresponding load during work.640 (1)
2
Determine the modification plan of the piling arm according to actual needs. The modification plan of the pile driving arm can be customized according to the different needs of the engineering project, such as modification to a single pile arm or double pile arm, and modification to a fixed or rotatable type, etc. In addition, it is necessary to select appropriate materials and structural design based on the modified working range and working conditions of the piling arm to ensure that the modified piling arm has sufficient strength and stability.
3
Carry out modification construction of pile driving arm. The modification construction includes disassembling the original excavator parts and installing the modified piling arm and corresponding hydraulic system, electrical system, etc. During the construction process, it is necessary to strictly follow the modification plan, ensure that the installation position and connection method of each component are correct, and carry out necessary debugging and testing to verify the working performance and safety of the modified piling arm.640 (3)
4
Carry out trial operation and commissioning of the modified piling arm. Trial operation and debugging are important links to ensure that the modified piling arm can work properly. During the trial operation and debugging process, various functions of the pile driving arm need to be tested and adjusted, including lifting, rotation, telescopic and other functions, to ensure that the various working indicators of the pile driving arm meet the design requirements and can meet the requirements of the actual engineering project. need.

640 (4)
Excavator piling arm modification is a complex engineering machinery modification project, which requires comprehensive consideration of the excavator’s mechanical structure and performance, and reasonable modification plan design and construction operations based on actual needs. Only when the modification is carried out in strict accordance with the process flow, can the modified piling arm be ensured to have good working performance and safety, and provide reliable support for the smooth progress of the project.640 (5)

Yantai Juxiang Construction Machinery Co., Ltd. is one of the largest excavator attachment design and manufacturing companies in China. Juxiang Machinery has 15 years of experience in piling arm modification, more than 50 R&D engineers, and more than 2,000 sets of piling equipment shipped annually. It has maintained close cooperation with domestic first-tier OEMs such as Sany, Xugong, and Liugong all year round. The piling equipment produced by Juxiang Machinery has excellent craftsmanship and superb technology. The products have benefited 18 countries, sold well all over the world, and received unanimous praise. Juxiang has the outstanding ability to provide customers with systematic and complete sets of engineering equipment and solutions. It is a reliable engineering equipment solution service provider and welcomes consultation and cooperation with Laotie who have modification needs.