Advantages of Juxiang pile driver
● High efficiency: The speed of vibrating pile sinking and pulling out is generally 5-7 meters/minute, and the fastest is 12 meters/minute (in non-silty soil). The construction speed is much faster than other pile driving machines, and is faster than pneumatic hammers and diesel hammers. Efficiency is 40%-100% higher.

●Wide range: In addition to not being able to penetrate into rocks, Juxiang pile driver is suitable for construction under almost any harsh geological conditions and can easily penetrate pebbles, sand and other geological conditions.

●Multiple functions: In addition to the construction of various load-bearing piles, the Juxiang pile driver can also construct thin-walled anti-seepage walls, deep densification processing, ground compaction processing and other special constructions.

● Wide range of functions: suitable for driving piles of any shape and material, such as steel pipe piles and concrete pipe piles; suitable for any soil layer; can be used for piling, pulling out piles and underwater piling; and can be used for pile racking operations and suspension operations.

ella@jxhammeroperating instructions
As a kind of auxiliary machinery for construction, the nature of the excavator and pile driver determines the importance of standardized operation and use. In order to ensure safe construction, today the excavator and pile driver manufacturer Juxiang Machinery will summarize some operating specifications for you:

● Personnel specifications: Operators must be familiar with the structure, performance, operating essentials and safety precautions of the machine. Only after passing the examination and obtaining the certificate can they operate alone, so as to promptly solve emergencies during the construction process and reduce or Avoid mechanical breakdowns or project delays caused by mechanical problems.

● Work specifications: All staff members should communicate with each other about operation signals in advance. Before starting work, other persons not related to the work must stay away from the site. In addition, excavator and pile driver operators need to be familiar with the construction process before construction to ensure a fast and efficient construction process.

● Environmental attention: Operations should be stopped in bad weather. When the wind force is greater than level 7, the excavator should be parked in the wind direction, the pile driver should be lowered, and a windproof cable should be added. If necessary, the pile frame should be brought down, and lightning protection measures should be taken. Personnel should stay away from the pile driver in the event of lightning.

● Operating specifications: The excavator pile driver should adopt pile caps and liners that are suitable for the pile type, pile frame and pile hammer. If damage is found, it should be corrected or replaced in time; during use, pipe joints with pressure vibration should be checked and tightened. Tighten the bolts with the oil pump to ensure that there is no oil or air leakage; the excavator pile driver must be directed by a dedicated person when traveling, and pay attention to avoid dangerous areas such as high-voltage lines and puddles to avoid mechanical damage due to accidents.

ella@jxhammer.com-2Maintenance instructions
Maintenance specifications Strictly follow the instructions and perform corresponding maintenance. After the excavator pile driver is used in construction, wear and tear is inevitable. However, in order to ensure its normal performance and extend the service life of the machine, after-use maintenance is extremely important.

● The first maintenance time of the gearbox of the pile driver is 4 hours. The industrial gear oil Mobil 85-w140 should be replaced as required. It will be maintained again for 20 hours and the third maintenance will be done after 50 hours. The gear oil will be replaced every 200 hours thereafter. The key maintenance in the first week of work can be increased or decreased according to the intensity of the work. In addition, when replacing the gear oil, you need to use diesel to clean the inner box and the gyromagnetic cover to absorb impurities, and then perform the gear oil replacement process.

ella@jxhammer.com-3