Juxiang Side Grip vibro Hammer for Excavator

Short Description:

A side-gripping pile driver is an engineering equipment used to drive piles, whether wooden or steel, into the ground. Its distinctive feature is the presence of a side-gripping mechanism that allows driving from one side of the pile without requiring the machine to move. This mechanism enables the pile driver to work effectively in confined spaces and is particularly suitable for situations requiring precise positioning.


Product Detail

Specification

Warranty

Maintenance

Product Tags

Side Grip vibro Hammer for Excavator spe02

Product advantages

Side Grip vibro Hammer for Excavator spe03

The advantages of a side-gripping pile driver include:
1. **Space Efficiency:** Due to the absence of backward movement, the side-gripping pile driver is suitable for operations within limited workspaces, especially in urban or narrow construction sites.
2. **Reduced Equipment Movement:** The side-gripping mechanism allows driving at a fixed position, reducing the frequency of machine movement and enhancing operational efficiency.
3. **Precise Positioning:** The side-gripping pile driver enables more accurate pile positioning, proving highly beneficial in tasks requiring exact pile placement, such as construction near existing structures.
4. **Less Ground Disruption:** With reduced need for repositioning, the side-gripping pile driver minimizes ground disruption, particularly valuable for construction in sensitive areas or on lawns.
5. **Enhanced Construction Safety:**  The side-gripping mechanism reduces the risk of equipment collision with other objects, thus enhancing safety during construction.

In summary, the side-gripping pile driver offers distinct advantages in precise positioning and efficient pile driving within confined spaces.

Design advantage

Side Grip vibro Hammer for Excavator spe01
Side Grip vibro Hammer for Excavator  advantage02
Side Grip vibro Hammer for Excavator  advantage03
Side Grip vibro Hammer for Excavator  advantage04
Side Grip vibro Hammer for Excavator  advantage01
Side Grip vibro Hammer for Excavator  advantage07
Side Grip vibro Hammer for Excavator  advantage06
Side Grip vibro Hammer for Excavator  advantage05

product display

Side Grip vibro Hammer for Excavator  display02
Side Grip vibro Hammer for Excavator  display03
Side Grip vibro Hammer for Excavator  display01

Applications

Our product is suitable for excavators of various brands and we have established long-term and stable partnerships with some well-known brands.

cor2
factory

About Juxiang


  • Previous:
  • Next:

  • Excavator use Juxiang S600 Sheet Pile Vibro Hammer

    Accessoryname Warrantyperiod Warranty Range
    Motor 12 months It is free to replace the cracked shell and broken output shaft within 12 months. If the oil leakage occurs for more than 3 months, it is not covered by the claim. You must purchase the oil seal by yourself.
    Eccentricironassembly 12 months The rolling element and the track stuck and corroded are not covered by the claim because the lubricating oil is not filled according to the specified time, the oil seal replacement time is exceeded, and the regular maintenance is poor.
    ShellAssembly 12 months Damages caused by non-compliance with operating practices,and breaks caused by reinforce without the consent of our company,are not within the scope of claims.If Steel plate cracks within 12 months,the company will change the breaking parts;If Weld bead cracks,please weld by yourself.If you are not capable to weld,the company could weld for free,but no other expenses.
    Bearing 12 months The damage caused by poor regular maintenance, wrong operation, failure to add or replace gear oil as required or is not within the scope of claim.
    CylinderAssembly 12 months If the cylinder barrel is cracked or the cylinder rod is broken, the new component will be replaced free of charge. The oil leakage occurring within 3 months is not within the scope of claims, and the oil seal must be purchased by yourself.
    Solenoid Valve/throttle /check valve /flood valve 12 months The coil short-circuited due to external impact and the incorrect positive and negative connection is not in the scope of claim.
    Wiring harness 12 months The short circuit caused by external force extrusion, tearing, burning and wrong wire connection is not within the scope of claim settlement.
    Pipeline 6 months Damage caused by improper maintenance, external force collision, and excessive adjustment of the relief valve is not within the scope of claims.
    Bolts, foot switches, handles, connecting rods, fixed teeth, movable teeth and pin shafts are not guaranteed; The damage of parts caused by failure to use the company’s pipeline or failure to comply with the pipeline requirements provided by the company is not within the scope of claim settlement.

    1. When installing a pile driver onto an excavator, make sure the excavator’s hydraulic oil and filters are replaced after the installation and testing. This ensures the hydraulic system and parts of the pile driver work smoothly. Any impurities can damage the hydraulic system, causing issues and reducing the machine’s lifespan. **Note:** Pile drivers demand high standards from the excavator’s hydraulic system. Check and repair thoroughly before installation.

    2. New pile drivers need a break-in period. For the first week of use, change the gear oil after half a day to a day’s work, then every 3 days. That’s three gear oil changes within a week. After this, do regular maintenance based on working hours. Change the gear oil every 200 working hours (but no more than 500 hours). This frequency can be adjusted depending on how much you work. Also, clean the magnet each time you change the oil. **Note:** Don’t go longer than 6 months between maintenance.

    3. The magnet inside mainly filters. During pile driving, friction creates iron particles. The magnet keeps the oil clean by attracting these particles, reducing wear. Cleaning the magnet is important, about every 100 working hours, adjusting as needed based on how much you work.

    4. Before starting each day, warm up the machine for 10-15 minutes. When the machine has been idle, oil settles at the bottom. Starting it means the upper parts lack lubrication initially. After about 30 seconds, the oil pump circulates oil to where it’s needed. This reduces wear on parts like pistons, rods, and shafts. While warming up, check screws and bolts, or grease parts for lubrication.

    5. When driving piles, use less force initially. More resistance means more patience. Gradually drive the pile in. If the first level of vibration works, there’s no need to rush with the second level. Understand, while it might be quicker, more vibration increases wear. Whether using the first or second level, if pile progress is slow, pull the pile out 1 to 2 meters. With the pile driver and excavator’s power, this helps the pile go deeper.

    6. After driving the pile, wait 5 seconds before releasing the grip. This reduces wear on the clamp and other parts. When releasing the pedal after driving the pile, due to inertia, all parts are tight. This reduces wear. The best time to release the grip is when the pile driver stops vibrating.

    7. The rotating motor is for installing and removing piles. Don’t use it to correct pile positions caused by resistance or twisting. The combined effect of resistance and the pile driver’s vibration is too much for the motor, leading to damage over time.

    8. Reversing the motor during over-rotation stresses it, causing damage. Leave 1 to 2 seconds between reversing the motor to avoid straining it and its parts, extending their life.

    9. While working, watch for any issues, like unusual shaking of oil pipes, high temperatures, or odd sounds. If you notice something, stop immediately to check. Small things can prevent big problems.

    10. Ignoring small issues leads to big ones. Understanding and caring for equipment not only reduces damage but also costs and delays.

  • Other Level Vibro Hammer

    Other Attachments